The Third Addition in Tecate

The Third addidtion in Tecate were three large rooms added to the back of the trailer.(2008)

The beginning construction of the three rooms

The three rooms were first erected from bricks

The structure is finished.

The inside of the boys room being used though it is unfinished because of the pressing need (the three rooms are completed now interiorly!!)

The interior of the Second room added: a living room, also it is unfininshed in this picture (though now it is completed interiorly)

These are showers that were added to the living room, and also another room with multiple toilets and a sink for kids.

The completed three rooms!!